Chemical Plant Upgrade
DESIGN-BUILD CONTROL SYSTEM UPGRADE OF FULLY OPERATIONAL CHEMICAL PLANT
FACTS
• 6 Years, 2-7 Professionals
• On-site Electrical/Instrument Trailer
• 900 IO Points
• Allen Bradley PLC
• iFix SCADA and Historian
• 50 Custom SQL Server Reports
• SAP Orders Converted to Recipes for Operators and Equipment via Custom VB Code
• Installation of new Plant Ethernet Network/Thin Client Operator Interfaces
SERVICES & DELIVERABLES
Worked with the Engineering and Production staff of a Japanese headquartered specialty chemical manufacturer to upgrade the entire manufacturing plant control system.
Preliminary Engineering and Detailed Design Phase Deliverables:
User Requirement Specification (URS), Functional Specification (FS), Control Panel Design, Plant Network Design
Construction Phase Deliverables:
Control Panel, Instrumentation, Control System Software, Factory Acceptance Test (FAT), Installed 9 Panel Mounted Operator Interface Terminals and Ethernet Network, Site Acceptance Test (SAT), Clean Room and Grey Space Electrical Installation.
All Case Studies
GREEN FIELD
Starting with a blank canvas
Working to help your thoughts and ideas to become a reality.
: Chemical Plant Upgrade
SITE-WIDE UPGRADES
Align Business and Manufacturing
Migrating legacy production systems to increase reliability, quality, and operational efficiency.